| Lucky Hood-shot at 60 mph. |
RHYMES WITH TRUCK
Wednesday, July 27, 2011
Calgary, Alberta.
| Five drops in the City of Calgary, Ab. |
____Day 1: Niverville to Calgary, at just over 1300 kilometres, is just over a legal days work for me and although there are many who have done it in one hit; I am not about to join their ranks. A midday departure and an early evening finish in Regina completes my Saturday shift.
| The Great Wall of Canada. |
____Day 2: Several times at a new employer, I have tried to prove how good I am by doing big mileages in short times. But if you do it once then it becomes expected and you have made a rod for your own back; burn-out soon follows. This time I am starting as I mean to go on: so Sunday is an other easy drive of less than eight hours. Through to Calgary's Flying'J truckstop.
____Day 3: With five drops, it's good that I am refreshed and ready to go with all the addresses tapped into the Sat-Nav. Rarely has it been so easy; each place starts on me as soon as I arrive and without hurrying: I am back at the Flying Hook before noon. Others, however, are having a nightmare! Flying Eagle #28, with a new driver doing his first week as a truck-driver in Canada, has lost his wallet. I wait for him to arrive before filling his diesel tanks and loaning him a fuel card. It's a delay, but not costly, the reload is insulation from High River. Only 30 miles south and I beat the 15.00 hours loading deadline by more than two minutes. It's a place where I have loaded before, which helped.
____Day 4: Loaded with just 6000 lbs, the trailer is brim full. A strong side wind doesn't make for the best of journeys as I drive the 1000 km from Redcliff to Niverville, back to the yard. The Peterbilt is now up to 50,000 kilometres and due a service, so the city truck can deliver the load. A short trip, but already time for another log hours reset.
____Overall Distance: 2814km.
____Day 3: With five drops, it's good that I am refreshed and ready to go with all the addresses tapped into the Sat-Nav. Rarely has it been so easy; each place starts on me as soon as I arrive and without hurrying: I am back at the Flying Hook before noon. Others, however, are having a nightmare! Flying Eagle #28, with a new driver doing his first week as a truck-driver in Canada, has lost his wallet. I wait for him to arrive before filling his diesel tanks and loaning him a fuel card. It's a delay, but not costly, the reload is insulation from High River. Only 30 miles south and I beat the 15.00 hours loading deadline by more than two minutes. It's a place where I have loaded before, which helped.
____Day 4: Loaded with just 6000 lbs, the trailer is brim full. A strong side wind doesn't make for the best of journeys as I drive the 1000 km from Redcliff to Niverville, back to the yard. The Peterbilt is now up to 50,000 kilometres and due a service, so the city truck can deliver the load. A short trip, but already time for another log hours reset.
____Overall Distance: 2814km.
| Remembering the last time I loaded at High River: Brrrrrrr. |
Friday, July 22, 2011
Atlanta Groupage To Alberta.
____Day 1: Weekend work is a normal part of a long-haul truckers life and as I leave on a Friday; for a Monday morning delivery in Atlanta, Georgia, I can console myself with the knowledge that I won't be wasting all my money on fast women and slow horses. Again. At Rothsay, I meet-up with Mr. Ramsden for lunch; before heading down to Iowa.
| Searcy Volvo 202 with bits of Caterpillar bound for Red Deer, Ab. |
| Gateway Arch at St. Louis; why did I think it went over the river? |
____Day 2: With all the miles that I drive; it is inevitable that there will be occasions when I unintentionally hinder the progress of a fellow traveller. I instinctively know when someone is going to "flip me the bird". To counter this; I slip on my reading glasses, pull down my cap, stick out my chin and lean right forward while white-knuckling the steering-wheel at ten-to-two; eyes front. A black Dodge Charger with all-round privacy glass and 22 inch chrome rims comes alongside with the passenger window descending. But when the irrate driver looks up and sees such a gormless pratt; he knows that any gesticulation would be completly wasted and speeds on: thankful to have escaped without any panel damage. It works well for the old and unshaven. Otherwise, it was a easy days drive down through St. Louis and onto Mount Vernon.
____Day 3: South, through Nashville and Chattenooga; where I avoid the worst of a traffic jam by listening to advice on the CB radio. I don't often have the radio switched on, but with traffic tail-backs, it is the best thing for on the spot information. Through Atlanta at dusk; parking on the unloading bay at the customer, ready for the morning.
____Day 4: Unloaded and breakfast at the Petro Iron Skillet; before loading two roller shutter doors at Lawrenceville. Then an hours drive down to Grffin, to load a 32 litre diesel engine from the Caterpillar parts distribution warehouse. A quick glimpse at the invoice shows that the price is more than the whole cost of my 386 Peterbilt when it was new. The astronomical price of todays earth-moving plant makes me shudder.
____Day 5: Still plenty of room on the trailer and the office is looking for goods going to Alberta; the destination of the doors and the engine. They find nine pallets of aquarium equipment; waiting at Edwardsville, Il. Nearly a days drive, but the shipper is open 24 hours and I get loaded. Northbound out of St. Louis on Highway 61 at the end of the day.
____Day 6: Space for two more pallets; one from Elkhart, Iowa, and one from the nearby town of Nevada. In my quest to drive new roads everyday, I often waste a lot of time on fractured cross-country routes. But this time the Iowa State Highway 163; from Mt. Pleasant, north-west, to Des Moines, stumble across a hidden gem. It looks nothing special on the map but is a well-surfaced four-lane route with no traffic lights or stop signs. Finally fully loaded; as far as Hasty, back in Minnesota.
____Day 7: Although all the consignments are for Alberta; I'm told to bring it back to Niverville. Resetting my log book hours before continuing with the load. A visit to the Northstar Truck Wash at Fargo clears the bugs from the bumper and the new bug deflector on the hood. Also the twenty-four new LED marker lights on the cab get their first taste of a high pressure hose-down.
Wednesday, July 13, 2011
Minnesota Rest Area Closures.
____Day 1: A load of oat animal feed, presumably for horses, going to Grinnell in Iowa; booked in for 08.00 monday morning. The familiar route of Interstate 29 through North Dakota; then Interstate 94 in Minnesota. The rest areas in Minnesota are now all closed for the second week; as the state government tries to cut costs. A big safety issue in my mind, as tired drivers now have to push on through. Also they are a handy and economical piss-stop that saves precious diesel with an easy-off, easy-on short detour. I stop the night at the Iowa Rest Area at Ames; which is, not only, open but has free WiFi Internet.
| Closed Rest Areas now mean Minnesota's queers will have to drive out of state for a pee. |
____Day 1: A load of oat animal feed, presumably for horses, going to Grinnell in Iowa; booked in for 08.00 monday morning. The familiar route of Interstate 29 through North Dakota; then Interstate 94 in Minnesota. The rest areas in Minnesota are now all closed for the second week; as the state government tries to cut costs. A big safety issue in my mind, as tired drivers now have to push on through. Also they are a handy and economical piss-stop that saves precious diesel with an easy-off, easy-on short detour. I stop the night at the Iowa Rest Area at Ames; which is, not only, open but has free WiFi Internet.
____Day 2: Woken and shaken, by a violent thunderstorm, during the night; I don't realise the severity of it until driving the one hour across country to Grinnell in the morning. Trees and power lines down and structural damage to farm buildings and homes. My delivery point is intact and I am soon unloaded; then up to Mason City for animal feed going to Manitoba. This time, 18 big bags of whey powder. Straight back to Canada, with a night at Sauk Centre's Trucker's Inn. It's vast parking lot fuller than I have ever seen it before; due to the lost spaces at the Rest Areas.
| Mid-west's year of severe weather continues. |
| Loading at old style warehouse in Mason City, Iowa. |
____Day 3: With the hope of getting home for the night, I am up and away early. Back through Canadian Customs by midday and over to the New Rosendale Feed Mill, west of Portage Le Prairie, south of Highway 1. A Hutterite Colony enterprise; whose good work ethic always makes for a quick turn-round. They insist that I am Australian and only stop going on about it when I admit that I arrived from New Zealand at the end of Febuary. Which is true. Then, empty, back to the yard to complete a short trip.
____Overall Distance: 2876 km.
____Overall Distance: 2876 km.
Saturday, July 9, 2011
Troup, Texas.
____Day 1: Independence Day in the USA, no reason for them to celebrate as the unemployment rate is about to soar when 100,000 firework-selling outlets close down overnight. Not many trucks on the road as I head south to York in Nebraska; finishing at dusk, just as the pyrotechnics begin.
____Day 2: A second day of 1100 kay with the peat moss, parking overnight at the pot-plant nursery, just south of Troup. Three things are needed to grow good plants: sunshine, water and fertile soil. Texas has plenty of sunshine and irrigation takes the place of regular rainfall. Fertile soil is trucked in from Canada. The US does have it's own unlimited supply of peat moss; but it is in Alaska. Therefore Canada is the number one supplier and Manitoba, the main source for Texas.
____Day 3: After unloading; I set off for a reload of abrasive powder destined for Blackfalds in Alberta. Only one hours drive away; at Lufkin. Given the vast expanse of Texas; 57 miles is just next door. I'm heading homeward by noon, but not an easy afternoon's drive with the urban sprawl of Dallas/ Fort Worth and thunderstorms. Fuel from Oklahoma City; splash and dash. Crack-on to the Cimarron, a truckstop in the AmBest Group.
____Day 4: A round-trip in the truck can be compared to a frame of snooker, with some drivers happy just to sink a red: which equates to the next cup of coffee. I am always planning to be in position to sink the next six reds and six blacks; at least. After three difficult, long reds; I'm in a frame-winning position, left with just the colours on their spots. Avoiding self-inflicted snookers, such as speeding into sleepy townships on Highway 81; I reach Watertown, South Dakota. Keeping the daily kilometre average at over a thousand.
____Day 5: As I bring the load back to Niverville, in the early afternoon, for onward delivery by another truck; it proves to be the least economical of the Peterbilt's trips. Over 40,000 lbs in each direction and very little empty running. But as the truck only ever earns money when it is carrying a cargo; the very short dead-head makes this a profitable run for the company. The high daily-average mileage makes it a nice little earner for the driver.
| Not my favorite style of customising: but you have to admire the dedication needed to keep it clean. |
____Overall Distance: 4762 km.
Friday, July 8, 2011
Cruisin' the 'Peg.
| Sunday Evenings in Summer |
| Cars and Bikes, Old and New. |
| The parking lot at the Pony Corral on Grant Street. |
| A blue car looking a little blue. |
| Thelma and Louise Thunderbird. |
| Fastback Mustang looked like it had been pulled from a barn and fired up for the first time in 25 years. |
| Some did look very good for their age. |
| Mercury Cougar, an underrated classic. |
Saturday, July 2, 2011
Flying Eagle to Eagle Pass.
____Day 1: El Paso and Laredo are the best known of the Texan border towns leading into Mexico; but there are others and this trip takes me to Eagle Pass, one hundred miles upstream of Laredo on the Rio Grande. As there are only 15,000 lbs of quilted fabric in the trailer; I opt for the direct, two-lane route that takes me to a first night halt at Yankton. Where the state line between South Dakota and Nebraska runs down the centre of the Missouri River.
| The crest of the flood moved from the Dakotas to Missouri State during the trip. |
____Day 2: South on US Highway 81 and the temperature increases throughout the day. Just south of Oklahoma City, I stop at dusk with the thermometer showing 40 degrees C and am thankful for the air-conditioning from the trucks Tri-Pac. Normally I would be in the truckstop, buying a 12 volt, plug-in, electric fan to keep me cool at night. These cheap Chinese-made fans never last more than a couple of nights; so I always made sure I kept the receipt and the packaging: taking it back, first thing in the morning, for a full cash refund.
| Old Freightliner on Mexican plates; smarter than most. |
____Day 3: Part three of the 1675 mile crossing of the USA, border to border. The last hundred miles; west from Interstate 35, across a flat landscape of endless head-high bushes, dry and dusty. To the small town of Eagle Pass, that relies on the business created by the transhipping of freight and the customers of a giant casino. Like border towns all over the world, the place puts me on edge.
| Directions to the packhouse: Dirt road 234 and look for the big stack of blue pallets. |
____Day 4: The 185 rolls of quilting look like they are for making mattresses and it takes three hours to unload the trailer as they are loaded into the mexican trailer on the next dock. The reload is for Winnipeg; from near the town of Floresville, three hours drive to the east. Watermelons and it is no surprise to learn that they will not be ready until tomorrow.
____Day 5: Waiting for hours at a hot and dusty pack-house in Texas reminds me of the umpteen wasted days spent in southern Spain waiting for caps, cues, toms and iceberg. The language is even the same: Spanish.
``Carga, aqui, ahorra``---``Load-me, here, now``
``Lo seinto, manana.``----``Sorry, Tomorrow``
I hate hauling perishables, especially when I it`s not in a fridge. I open the fresh-air vents and at 5 o`clock in the afternoon, I am ready to leave with 56 pallet bins of watermelons. Pushing on, north, out of Texas and into the late evening; as far as Calera in Oklahoma. To the Chocktaw Nation Casino, not the biggest casino in the world but the place with the biggest truck-parking of any casino anywhere.
____Day 6: The air-conditioning breaks down soon after I set off; now running a midday to midnight shift, with the windows open. Taking the four-lane route via Joplin and Kansas City. Then due to flooding of the Missouri River; detoured onto two-lane highways via Maryville, Clarinda and Avoca; up into the heart of Iowa.
____Day 7: The start of the big July Holiday week-end and a lot of people on the move. Armed with GPS equipment, many Americans who have never enhanced their driving skills since they passed their test, now venture out on ambitious trips. They have no lane disipline, driving etiquette and never use advanced driving techniques such as turn signals. In fact, many drivers are reluctant to indicate their intentions as they see it as an invasion of their privacy. But I`m the last person to deny someone the chance of a roadtrip. My solution: Integrate the GPS with the direction indicators of the vehicle; have the Sat-Nav work the winkers. It has to be better than nothing! Back into Canada by the end of the day.
____Day 8: The watermelons get dropped off. Not one of my favorite fruit. If I had to eat one; I would make sure I was sitting down in the bathroom. They go through me that fast. Then onto the Peterbilt dealer in Winnipeg for repairs to the air conditioning. Next week; it`s Texas again so it needs to be fixed.
____Overall Distance: 5569 km.
Monday, June 27, 2011
Friday, June 24, 2011
Sad End of Flying Eagle Flagship : Truck # 03.
____Day 1: Over the years I have been involved in several recovery jobs at various companies. One thing is always certain; it will not go smoothly and as the boss has just incurred enormous costs, pay for all the work done will be minimal. Instructions: take empty trailer to Osseo, Wisconsin, load damaged cargo from wrecked trailer and return it to the shipper in Indiana. Reload a replacement shipment and get it to Winnipeg, asap, undamaged. As I am empty, I get to choose the border crossing point; across country to Warroad, giving Interstate 29 a break on my way to Osseo via Duluth.
____Day 2: Flying Eagle #03 has gone off Interstate 94 into the trees; a sorry end to a heavily customised Peterbilt 379. A brand new Great Dane dry freight van, coming home from the factory, was carrying it's first cargo and now has the whole front torn off. But the cargo will not be released to me; so I leave the trailer at Osseo and new instructions send me bobtailing down to Terre Haute, Indiana, to collect another Great Dane for the Flying Eagle fleet.
| The driver escaped uninjured; except for his pride. |
____Day 3: Another early morning change of plans: the construction of Flying Eagle's new trailer hasn't been finished. But there is another trailer waiting to go to Canada at nearby Brazil. So new, that the paint on the chassis is still soft. Loaded with plastic film, I'm setting off back to Canada, nervously wondering if this load is not jinxed. Crazy, but I do think that some jobs work out like that. Back to Osseo, for no particular reason except that it's a quiet truckstop where a late arrival can always find a parking spot.
| A Great Dane outside the factory gates. It will never look that clean again. |
____Day 4: This time, I come back into Canada at Emerson. The trailer has to clear customs as an imported item, the same as the cargo. The trailer is going to the Great Dane dealer for the Canadian Prairies. It's set up for "Turnpiking", double-53 foot trailers on four-lane highways. A nice piece of kit with disc brakes, super-single tyres and a device that makes the rear suspension into a rigid unit; for when a fork-lift truck needs to run into the back. Just a four day trip, I leave the new Great Dane in the yard at Niverville and take a log hours reset, ready to leave again on Saturday morning.
____Overall Distance: 3470 km.
| #03, at it's best with it's old matching trailer. |
Sunday, June 19, 2011
Laredo, Texas.
____Day of the Wedding: Kevin and Melissa`s big day went very well. A first ever open-air ceremony for me in the grounds of Steinbach`s Mennonite Heritage Village. Surreal; in that the preacher wore shades and also that the man in the tinted eye-wear was Jim Penner, the driver-training guy at Big Freight Systems. I spent the whole of the service thinking of how Big Jim could integrate some marriage vows into orientation.
``Repeat after me: I : the gullible new driver......to have and to hold secure, causing no damage.....for better or for worse depending on miles.......for richer or for poorer depending on miles....to love, honour and obey my despatcher........till death does us part...... not!``
____Day 1: The peat-moss was loaded by a day-cab truck and needed the trailer axles sliding forward to get the excess weight off the drives. With the gross weight near to the american maximum of 80,000 lbs; not an easy task. Eventually underway and down to the Flying`J at Sioux Falls.
____Day 2: The second day into a headwind, but it`s all four-lane with not many hills. A thousand kilometres through Iowa, Missouri and into Oklahoma. Another night-out at another Flying`J: Checotah on Highway 69.
____Day 3: Into Texas, through Dallas, Austin and San Antone. To the twin truckstops of Laredo; a Flying`J and a TA, opposite each other. Full to over-flowing with taco stands doing good business at the roadside. The CB is full of offers, cheap DVDs and shuttle rides across the border for a good time. Been there, done that and came back with my tail between my legs.
____Day 4: Almost all the truck traffic coming down to Laredo has stuff for Mexico. But because of restrictions by the insurance companies, no Canadian or American trucks cross the border. All loads are transhipped onto Mexican trailers at warehouses along the banks of the Rio Grande. My peat-moss was off-loaded at one such place. The reload was four miles upstream; thirty-nine cement mixers, waiting on a Mexican trailer. Transhipped by six-thirty and I`m northbound upto New Braunfels for the night.
____Day 5: It`s a much lighter load and to vary the route; I follow the old Chisholm Trail, Interstate 35. Named after Jesse Chisholm, Indian guide and speaker of nine languages, a man renowned for his honesty and fairness who actually never drove any cattle along the trail that bears his name. Taking a westerly route through Kansas up to Salina for food and fuel.
![]() |
____Day 6: A lot of the day on Highway 81, straight north until it cuts across the Interstate 29 at Watertown, South Dakota. Through flood water stretching for two miles; showing how severe the weather can be on the plains. Finishing at the Stamart Truckstop, Fargo and the Northstar Truck Wash; number 31 having a high-pressure hose-down for the first time.
____Day 7: Not much left to do, three hours back to the yard with the cement-mixers going on to Winnipeg on Monday.
____Overall Distance: 5500 km.
Subscribe to:
Posts (Atom)
